贝科工程咨询(上海)有限公司-凯发k8天生赢家一触即发

 
管理团队
联系凯发k8天生赢家一触即发
地址:北京市朝阳区甘露园南里20号楼-4至15层101号7层5号

邮编:100123

电话: 86-13911144282
derek has been leading the beca buildings team in china for several years, helping to grow

beca’s reputation by providing high standards in building services systems design and quality of design delivery. although he has a particular interest in plumbing and water services, his skills in related mechanical systems and a holistic understanding of how building projects are delivered, is a highly sought after in the china buildings market.

derek 在中国领导贝科建筑团队已有很多年,他通过提供高标准的建筑服务专业设计和完成高质量的设计项目,帮助贝科建立起良好的声誉。derek 不仅具备给排水专业精湛的技术水平,同时在其他相关建筑机电领域的专知识以及秉承完整的建筑设计、施工直至交付的管理理念,这使贝科在中国建筑市场备受青睐。 

                                                          
derek has experienced working in variety of asian countries including singapore, east malaysia,indonesia, hong kong and taipei. he has enjoyed the opportunity to work within these different cultures and has got to grips with the challenge and necessity of using clear and concise communications to get his message across. his regular visits to beca key hub offices in singapore and auckland, allows him to maintain close contacts with other technical leaders in beca and translate this beca experience to his china clients.
derek 累积了大量亚洲不同国家和地区的工作经验,包括新加坡、马来西亚、印度尼西亚、香港和台北。 在体会不同的文化背景工作的同时,他迎接挑战并运用清晰和简明的沟通能力拓展业务。他定期往返于贝科新加坡和奥克兰的总部,这使他能保持与贝科其他高层技术领导人紧密联系,并将这些经验传递给中国的客户。

citizenship 

citizenship                                           

新加坡

awards

winner of beca innovate 2008 awards

    2008 贝科创新奖

special competence

construction and contract management of multi-disciplinary civil engineering projects.

investigation and design of water supply schemes

project management of design teams for civil engineering projects.

investigation and design of wastewater disposal schemes

large commercial and institutional building project set up

large commercial and institutional building project set up

多学科工程项目施工及合同管理

给排水系统研究及设计

工程项目设计团队的项目管理

废水系统研究及设计

大型商业及办公项目建立

合同采购及设计管理

background

nov 2008 – present:

beca engineering consulting (shanghai) co ltd, general manager/directo

         2008 年至今:

总经理兼董事,贝科工程咨询(上海)有限公司

nov 2004 – nov 2008:

beca engineering consulting (shanghai)co ltd, director

2004年 11月至200811 月:

董事,贝科工程咨询(上海)有限公司

jun 2003 – nov 2004:

beca carter hollings & ferner (sea) pteltd, directo

20036月至200411 月:

董事,贝科(东南亚)私人有限公司

aug 1999 – may 2003:

beca carter hollings & ferner (sea) pteltd, associate director

19998月至2003 5月:

副董事,贝科(东南亚)私人有限公司

jan 1995 – jul 1999:

beca carter hollings & ferner (sea) pte ltd, manager (m&e) associate

19951月至19997月:

经理,贝科(东南亚)私人有限公司

jul 1993 – dec 1994:

beca carter hollings & ferner (sea) pte ltd, senior engineer

19937月至199412月:

高级工程师,贝科(东南亚)私人有限公司

1987 – jun 1993:

beca carter hollings & ferner (sea) pte ltd, engineer

1987年至19936月:

工程师,贝科(东南亚)私人有限公司



relevant experience


key project responsibilities

particular responsibilities include client briefing, project management and review of design and specification for commercial division of beca buildings.

 project setup, procurement and design management

involved in the following projects either as a job director role or job manager role. duties in these roles covered dealing with clients on their requirements, coordinating with other consultants, leading and aligning a team of beca/becs engineers to achieve clients’ requirements:

主要项目职责

特殊职责包括向业主汇报,项目管理及审核贝科商业分区的设计及技术规范

项目建立,合同采购及设计管理

有关作为项目董事或项目经理角色参与的项目,工作包括按照客户要求处理问题,与其他顾问合作,领导和指引贝科工程团队达到客户的要求。

beca engineering consulting(shanghai) co ltd, nov 2004 - present

贝科工程咨询(上海)有限公司

china experiences

中国经验

type of projects-住宅


项目类型-住宅

feng qiao villas, beijing

北京枫桥别墅

188 nos villas ranging from 400sqm to 700sqm per villa. 52 units are 4 levels and 136 units are 3 levels (all units are built with its own basement). there is also an approximate 8000sqm of clubhouse. the clubhouse consists of 4 levels inclusive a basement. facilities like swimming pool, gymnasium, tennis courts, and activities room are all within the clubhouse.

188栋别墅,每栋别墅从400平方米至700平方米,52个单元是四层,136个单元是三层(所有单元都有自己的地下室)。还有约8000平方米的会所,会所由四层地下室组成,包括游泳池、健身房,网球场及活动房。

mixed development


综合项目

closed to 600,000sqm mixed developments in changfeng putou, shanghai for guocoland

上海浦陀长风生态商务区600,000平方米综合开发项目

600,000 sqm dongzhimen mixed development in beijing for guocolandthe donghua mixed development is situated at dong zhimen and comprises of 5 main zones, namely the hotel, office twin towers, service condos with a clubhouse located in-between, retails (north zone and south zone), and lastly the airport terminal hall and the bus interchange. the entire development shares 2 levels of basement carparks and m&e plant room space.

600,000平方米东直门东华广场暨交通枢纽工程(位于东直门,包含5个区块,分别为15星级酒店;双塔写字楼及其底层商业;2座服务式公寓及会所,以及其底层商业;南区及北区商业;机场航站楼位于整个项目西南侧以及与其贯通的公交站场。所有的区块共用两层的地下部分,其中包含车库及机电用房等设施。)

xi’an capitaretail mixed development (230,000sqm)

西安凯德综合发展项目(230,000平方米)

beijing cito

北京明日之城

 2 separate functional zones. phase 1 is for the residential zone and gfa is 84,350 sqm. it’ includes 2 hotel apartment blocks, 7 apartment towers, 4 storey soho and 3 storey basement car park, phase 2 is for the commercial zone and gfa is 108,700 sqm. it includes 4-storey lease mall podium, 4 office towers, 1 hotel tower and 2 storey basement car park.  

两个独立的功能区,第一阶段是住宅区,总建筑面积约84,350 平方米,包括2个酒店式公寓区域,7栋公寓,4soho3层地下停车场第二阶段是商业区,总建筑面积约108,700平方米,包括4层出租商业裙房,4栋办公楼,1栋酒店及2层地下停车场

ruqi building chongqing

重庆瑞奇大厦

 the project consists of a 24-storey residential tower on a 9-storey podium and 5-level basement, with a total gross floor area of approx 86,000m2 and a site area of approx 5,702m2.

 该项目由9层裙房及裙房之上24层住宅和5层地下室组成,总建筑面积约为86,000平方米,占地面积约5,702平方米。

ascendas science & technology park, dalian, phase i & iii

大连腾飞科技园,一期及三期

retails


商场

qingdao olympic project (shopping mall)

青岛奥运村项目(大型购物中心)

beijing tian tong yuan shopping mall for capitaretail

凯德北京天通苑商场

the total gfa of the project is approximately 72,620 sq m comprising of two level of basement of approximately 33,489 sqm and four storeys above ground of approximately 39,131 sqm.

总建筑面积约为72,620平方米,包括二层地下室的建筑面积约为33,489平方米和地上四层商业区的建筑面积约为39,131平方米

capitalretail mall zhengzhou

郑州凯德商场

office


办公楼

90,00sqm software park in dalian for ascendas phase 1

90,000sqm 大连软件园第一期

106,000 sq m 34 storey grade a green office building for capitaland china group in beijing.

凯德大厦机电系统升级为国际“a”级写字楼工程(106,000 平方米,34层写字楼)

taikang office in beijing (the total area of the office building is approximately 38,000sqm with a total of 17 floors)

北京泰康人寿办公楼(该项目为地上17层,建筑面积约为38,000平方米)

imc tower in qingdao (a 240m office tower, gfa approx 217,000sqm)

青岛imc大厦 (240米高的办公楼,总建筑面积约217,000平方米)

ascendas science and technology park in hangzhou phase 1 stage 1(approximately 100,000sq.m of gfa)

杭州科技园区第一期第一阶段(第一阶段总建筑面积约100,000平米)

hotels


酒店

450 rooms crowne plaza hotel for join in group in suzhou

苏州皇冠假日大酒店(450间客房)

400 rooms for kempinski hotel group in dalian

凯宾斯基大连酒店(400间客房)

reviewer consultancy services role for kempinksi hotels in zhonguancun(beijing), qingdao, sanya, shanghai, taiyuan, yinchuan, tianjin, huizhou, inner mongolia, xian, guiyang, chongqing, suzhou and xiamen

北京中关村、青岛,三亚,上海,太原,银川,天津,惠州,内蒙古,西安,贵阳,重庆,苏州及厦门的凯宾斯基酒店顾问服务

crowne plaza hotel nanchang, jiangxi for redco properties (gfa is 39,500 sq m)

力高置业的江西南昌皇冠假日酒店(总建筑面积39,500 平方米)

renovation of  kempinski hotel, beijing

北京凯宾斯基酒店改造

guangzhou yingde hotel hot springs

广州英德酒店

intercontinental hotel in dalian (600 rooms)

大连洲际酒店(600间客房)

ningbo crowne plaza hotel

宁波皇冠酒店

the project gross floor area is approximately 142,000sqm, comprises of a 500 room hotel and serviced apartments.

该项目总占地面积约为142,000平方米,由500间客房的酒店和服务式公寓组成

intercontinental resort hotel in sanya (350 rooms.)

三亚洲际酒店(350间客房)

wanda hotel in sanya

万达三亚酒店

wanda hotel in dalian

万达大连酒店

wanda hotel in shijiazhuang

万达石家庄酒店

wanda hotel in tangshan

万达唐山酒店

wanda hotel in yichang

万达宜昌酒店

wanda hotel in huhehaote

万达呼和浩特酒店

hilton hotel in zhengzhou

郑州希尔顿酒店

cixi crowne plaza hotel

慈溪皇冠酒店

due diligence


调研评估

due diligence for joffre 688 shopping center in shanghai

上海淮海路688号商场评估

due diligence studies for a 120,000sqm office building for shui on (hongkong) in beijing

香港瑞安公司在北京的120,000平方米办公楼现场调研评估

due diligence studies for a 5 star hotel at fortune plaza in beijing for a singapore based client

北京财富中心五星级酒店现场调研评估

study on a smoke extract system for an existing 50 storey office building in shanghai

上海50层写安楼排烟系统调研

technical review harbor network rd center

港湾软件园中心技术审核

m&e review for nokia factory in dongguang

东莞诺基亚工厂机电审核

m&e review for capitaretail mall in tianjin

凯德天津湾机电审核

the site area is approximately 38000m2. the above ground is 4 storey retail approximately 56000m2 and basement one is carpark

该项目占地面积约38000平方米,地上四层是零售商店约56000平方米,地下一层是停车场

zhengzhou technical review

郑州建业项目技术审核

the site area is approximately 42,642.4m2 and comprises of zone a, b and c. the zone c the above ground is  41,876.75m2 and basement one is 13,425.54m2

该项目占地面积约42,642.4平方米包括abc区,c区地上四层是41,876.75平方米,地下一层是13,425.54平方米

tenancies


租赁

tenacy works in zpark for reuters

路透社租赁中关村软件园办公楼项目

reuters tenancy at zpark, beijing (gfa : 4617.58 sq m)

路透社研发中心(总建筑面积4617.58平方米)

mercedes benz showroom, beijing

北京奔驰汽车展厅

beca carter hollings & ferner (sea) pte ltd, 1987 – nov 2004

贝科(东南亚)私人有限公司

singapore/malaysia/indonesia/hongkong/taiwan/new zealand experiences

新加坡/马来西亚/印尼/香港/台湾/新西兰经验

involved in the following projects either as a job director role or job manager role. duties in these roles covered dealing with clients on their requirements, coordinating with other consultants, leading and aligning a team of beca/becs engineers to achieve clients’ requirements:

有关作为项目董事或项目经理角色参与的项目,工作包括按照客户要求处理问题,与其他顾问合作,领导和指引贝科工程团队达到客户的要求。

1.5 million sq ft of data centre (alexandra distripark)

150万平方米数据中心

morgan stanley taiwan (singapore)

台湾morgan stanley(新加坡)

dbs  tower 1(singapore)

dbs第一栋(新加坡)

bukit timah plaza(singapore)

bukit timah大厦(新加坡)

70 units naga court condominium(singapore)

70个单元naga court公寓(新加坡)

65 units 9 holt road condominium(singapore)

9 holt 路 65个单元公寓(新加坡)

65 units lloyd road condominium(singapore)

lloyd路 65个单元公寓(新加坡)

66 units hillview condominium(singapore)

66个单元hillview公寓(新加坡)

16 units cluny hill/park bungalows(singapore)

16个单元cluny hill/park别墅(新加坡)

mount palmer pumping station(singapore)

mount palmer泵站(新加坡)

bedok food factory(singapore)

bedok 食品工厂(新加坡)

morgan stanley asia ltd (hongkong)

morgan stanley亚洲公司(香港)

morgan stanley asia ltd technical monitoring system (hongkong)

morgan stanley亚洲公司技术监控系统(香港)

429 units waterplace condominium (singapore)

429个单元waterplace公寓(新加坡)

le meridien hotel expansion, jakarta(indonesia)

雅加达le meridien 酒店扩建(印尼)

bintan resort development(indonesia)

bintan度假村(印尼)

project management includes concept design of entire m&e systems for this 435 hectares site.  the components cover this development includes the following

项目管理包括这个435公顷场地整个机电系统的概念设计。组成如下:

infrastructure - water/power/telecommunication for the entire infrastructure (7 - 8 km of road).

基础构造 整个构造的水/能源/通讯(公路7 - 8 km

club med hotel - 320 room hotels. (indonesia)

俱乐部酒店- 320间客房(印尼)

golf and country clubhouse - 3 storey clubhouse supporting the 27 holes golf course (indonesia)

高尔夫和乡村俱乐部-支持27洞的高尔夫场地3层俱乐部(印尼)

27 holes golf course - electrical supply to all the irrigation pump station, golf course lightings. (indonesia)

27洞高尔夫场地-所有冲洗泵的电气供应,高尔夫场地照明(印尼)

support facilities - support facilities building to support the entire development. (indonesia)

备用设施-备用设施以支持整个建筑物(印尼)

villas/apartments -242 units of villas/apartments(indonesia)

别墅/公寓-242个别墅单元/公寓(印尼)

72 units 4-storey eastwood park condominium (singapore)

72个单元4eastwood park 公寓(新加坡)

cikarang tech park, jakarta (indonesia)

雅加达cikarang tech公园(印尼)

retrofitting of 3m singapore

新加坡3m翻新(新加坡)

3m jalan pemimpin - tenancy works (malaysia)

3m jalan pemimpin-租赁工作(印尼)

3m seremban factory, malaysia

马来西亚3m seremban 工厂

12-storey merchant court hotel(singapore)

12merchant 庭院酒店(新加坡)

killiney road service apartments (singapore)

killiney road 服务式公寓(新加坡)

网站地图